Location: Saco, ME
Owner: FedEx Corporation
Design Team: PM Construction
Completed: August 2011
Jewett erected two pre-engineered metal buildings for the FedEx Ground Facility in Saco, Maine. The project totaling 84,500 SF provides added warehouse space and seven new loading dock doors. Additional work included the removal of existing end wall siding, wall girts and columns prior to the expansion—all without disturbing the facility’s day-to-day operations. Additional challenges included working in severely confined areas with limited access around the perimeter of the building.